This lift’s hand rails and front plates were only a small part of the work carried out for The New Armouries at the Tower of London.  This exacting project included additional barrier and steel fitment work to a very high specification.

This office entrance was commissioned for premises in Shoe Lane, London. The work included an extensive venting system, stainless steel ceiling, and glass channeling. The project was completed in March 2000.
Click on pictures to see larger versions.

Abbott Fabrications - stainless steel and sheet metal fabrication engineers for exhibition, architectural, food industry, prototype and shop fitting work.  Higham Ferrers, Wellingborough, Northants, Northamptonshire.

Home   Location    projects 01    projects 03